Zenoah TWIN GT80 Instruction Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
20
Step 5. Using a Moto-Tool and a cut-off wheel, cut the bolt on
the side with the head so that 1" of thread remains exposed.
Step 6. Thread an A-nut (included with swivel clevis) onto each
side of the threaded rod and securely tighten against the rudder.
Step 7. Screw a molded swivel link onto each side of the 8-32
threaded rod so that it is tight against the A-nut.
Step 8. Hinge the rudder using the same technique as with the
aileron and elevator.
Step 9. Remove the stock servo arms and replace them with
heavy-duty 1
1
/4" arms. The arms need to be positioned as shown.
Step 10. Screw a 4-40 ball link 5 to 6 turns onto a 5" long
4-40 linkage. Screw the opposite end of the linkage into the swivel
control horn that was installed in Section 6. Adjust the length
until the hole in the ball link lines up with the outer hole in the
servo arm when the rudder is at neutral and the arm is centered.
Step 11. Using the 4-40 screws and nuts included in the
Rocket City package, attach the ball link to the outer hole in the
arm. The correct sequence is 4-40 screw, ball link, servo arm,
and 4-40 nut. (Dont use the spacer/standoff.) Be sure to use
Blue Locktite
®
.
Step 12. Repeat Step 10 and Step 11 for the other rudder servo.
Section 7: Installing the Rudder, Control Horns,
and Linkages
CONTINUED
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 39 40

Comments to this Manuals

No comments