Zenoah TWIN GT80 Instruction Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
17
Step 4. Mix a small amount of 30-minute epoxy and lightly coat
the inside of the threaded holes and the 8-32 x 2" Rocket City
screw. From the top of the elevator, thread the 8-32 screws into
the tapped holes and tighten. Wipe away any excess epoxy with
rubbing alcohol and paper towels.
Step 5. Screw the molded swivel link onto the 8-32 screw until
the distance from the elevator surface to the bottom of the link is
5
/8". Repeat this for the other elevator.
Step 6. Glue the elevator hinges in place using the same
techniques used to hinge the ailerons. After hinging the elevator,
use the same technique to seal the elevators hinge gaps. Use
White UltraCote
®
for the bottom of the elevator. You can
substitute Clear UltraCote
®
if White is not available.
Step 7. Notice that the longer of the two tail tubes has a hole at
each end and that a hole is located near the center of the stab on
the top. It may be covered with UltraCote
®
. If so, use a #11 knife
blade to remove the covering over the hole. A 4-40 x
3
/8" socket
head screw and split washer are threaded through the hole in the
each half of the stabilizer and into the tail tube. This securely
fastens the stab to the fuselage.
Step 8. Insert the longer of the two tubes into the rear hole in
the stabilizer root. Carefully align the hole in the tube with the
hole in the stab. Thread the 4-40 socket head screw and split
washer into the hole securing the tube to the stab.
Section 6: Installing the Elevator, Control Horns,
and Linkages
CONTINUED
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 39 40

Comments to this Manuals

No comments